Get Latest and Valid HPE6-A46 Braindumps – [Version 2018]

Money back guarantee of HP Implementing Aruba Campus Switching Solutions (Delta) HPE6-A46 exam is offered on the both products in case of a failure because the experts are confident about the quality and authenticity of the both products practice test software and PDF files. Save your time and money both and prepare HP Aruba Certified Switching Professional (ACSP) V1 – upgrade from HP ASE HPE6-A46 certification exam with the internationally recognized practice HPE6-A46 test software and HPE6-A46 PDF booklet. PDF files consist of Latest HPE6-A46 Braindumps that realy helps you in your acutal HPE6-A46 exam.

Vendor HP
Exam Code HPE6-A46
Full Exam Name Implementing Aruba Campus Switching Solutions (Delta)
Certification Name Aruba Certified Switching Professional (ACSP) V1 – upgrade from HP ASE
Technology

♥ 2018 Valid HPE6-A46 Braindumps♥

HPE6-A46 Braindumps, HPE6-A46 PDF dumps; HPE6-A46 exam dumps:: https://www.dumpsschool.com/HPE6-A46-exam-dumps.html ( Q&A) (New Questions Are 100% Available! Also Free Practice Test Software!)

Latest and Most Accurate HPE6-A46 Braindumps:

Question: 11

Which statement describes the availability metrics for an HPE system’s high availability?

A. All standard HPE servers are designed for 99.9999% availability.
B. A system consisting of HPE standard servers with an availability of 99.9999% and a storage with an availability of 99.99% will have a combined availability of 99.99999%.
C. A system with an availability of 99.99% can be expected to be in operational for 6 minutes or fewer per year.
D. A system with an availability of 99.999% will statistically not have an unscheduled downtime of more than 1 hour total in 10 years of operation.

Answer: B

Question: 12

A customer operates a data center based on third-party servers, which includes third-party storage with an iSCSI SAN.
The architect needs to design a solution that can seamlessly access the current data from a new HPE Moonshot system.
How can the HPE Moonshot system access the legacy storage?

A. using native iSCSI target software to connect to the storage on a dedicated LAN
B. using native iSCSI initiator to connect to the storage on a dedicated LAN
C. using native iSCSI initiator to connect to the storage on the management LAN
D. using an HPE Multifunction router to convert iSCSI to Virtual Connect

Answer: B

Question: 13

An architect is planning an HPE Moonshot System deployment. The architect plans to individually connect each iLO CM module to the management network. The customer informs the architect that this plan requires too many 1GbE ports per rack for the data center infrastructure.
What is one way that the architect can alter the plan to meet the customer’s needs, while still allowing iLO access to the HPE Moonshot Systems?

A. Configure iLO traffic to share the same adapters as production traffic. Configure VLANs on the HPE Moonshot switch modules to separate the two types of traffic.
B. Keep one iLO CM Management port connected to the network. Use the iLO CM link ports on each iLO CM module to daisy chain the chassis together.
C. Enable the iLO REST API on each cartridge node. The nodes will then accept iLO commands on the adapters that they use for production traffic.
D. Add a second switch module and uplink module to each chassis to connect to the cartridge iLO ports. Stack the modules in different chassis and connect just one to the management network.

Answer: D

Question: 14

A customer plans to use Insight Control server provisioning and HPE OneView for vCenter Server. The vCenter Server manages one c7000 enclosure with 16 server blades running VMware ESXI.
Which licensing option should the architect include in the proposal?

A. one HPE OneView Standard license for each managed server and one HPE OneView for vCenter Server license for the c7000 enclosure
B. one Insight Control server provisioning license for each managed server
C. one Insight Control server provisioning license for each managed server blade and one HPE OneView for vCenter Server license for the entire c7000 enclosure
D. one HPE OneView Advanced license for each managed server

Answer: C

Question: 15

A customer requests a proposal for an HPE Apollo 4530 system. The customer reports that it has experienced problems in the past with boot time malware attacks within its environment.
Which solution should the architect propose to protect the customer from this threat?

A. Use encrypted drives.
B. Use Smart Array Controllers.
C. Enable Legacy BIOS mode.
D. Enable UEFI secure boot mode.

Answer: D

New Updated HPE6-A46 Exam Questions HPE6-A46 PDF dumps HPE6-A46 practice exam dumps: https://www.dumpsschool.com/HPE6-A46-exam-dumps.html